XJR (X300) L6-4.0L SC (AJ16) (1995)
-
Mount a suitable dial gauge and check the crankshaft end-float.
-
Recheck the end-float and if satisfactory, clean the main bearing cap and bearing and lubricate with clean engine oil.
-
Refit the cap and bearing assembly, remove the dial gauge and torque tighten the main bearing cap securing bolts.
CAUTION: The main bearing securing bolts MUST be renewed during assembly and torque tightened as described under Engine, Service
and Repair, Service Procedures, SPS Joint Control System.
-
Refit the windage trays to the cylinder block. Fit and tighten the securing bolts.
-
Refit the oil pump.
-
Refit the oil pan.
Replace the components removed for access.