XJR (X308) V8-4.0L SC (AJ26) (1998)
Discard seals.
Clean and inspect mating faces.
Installation
1. Install new seals between fuel rail and charge air cooler adapter ensuring that they are fully seated.
2. Install fuel rail to fuel cross-over pipe.
Install new O-ring and lubricate with petroleum jelly.
Install bolt.
3. Install fuel rail to charge air cooler adaptor.
Locate fuel rail into adaptor.
Install bolts.