XJR (X308) V8-4.0L SC (AJ26) (1998)
6. NOTE: New bushes are bonded in position using a rapid drying adhesive Application of this adhesive and fitting of the bush must be completed
within 3 minutes. It is therefore strongly recommended that the procedure is rehearsed to ensure it can be completed within that period.
Position subframe on a hydraulic-press.
Position special tool 204-116-02 on press-bed, with recesses uppermost.
Position subframe on top of tool.
7. Apply Alphabond Rapid 101 epoxy adhesive to the shaded area of the bush shown, and the corresponding area of the bush-housing bore.