XK-8 Convertible (X100) V8-4.0L (AJ26) (1997)
1. Install Module
Connect harness connector to module.
Position module on underside of coolbox lid and firmly seat module on velcro pad.
2. Position lid on coolbox and install screws.
3. Install passenger side false bulkhead cover.
4. Connect ground cable to battery terminal and install battery cover. Refer to 'Starting and Charging, Battery, Service and Repair.'