XK-8 Convertible (X100) V8-4.0L (AJ26) (1997)
38. Connect the hoses and multi-plug to the coolant outlet pipe.
Connect the heater hose and reposition the hose clip.
Connect the multi-plug to the temperature sensor.
Expand and reposition the hose clip along the bypass hose.
39. Install the Intake Manifold. This operation includes installing the throttle housing.
40. Install the Timing Cover. This operation includes installing the top hose, refilling the coolant and installing the cam covers.
41. Move the engine compartment cover from the service position and connect the gas struts.
42. Remove the paint protection sheets and close the cover.
43. Connect the battery and install the battery cover.