jaguar Workshop Repair Guides

Jaguar Workshop Service and Repair Manuals

Variable Valve Timing Unit|Page 2472 > < Variable Valve Timing Unit|Page 2470
Page 3
background image

5. Remove the paint protection sheets and close the cover.
6. Connect the battery and install the battery cover.

Bank 2

Variable Valve Timing (VVT) Bush Carrier - Bank 2 12.65.52 

Removal 

1. Open the engine compartment and fit paintwork protection sheets.
2. Set the engine compartment cover to the service access position.
3. Open the driver's door, or both doors if necessary, to allow the side glass to drop. Ensure that the doors remain open until after the battery has been

disconnected.

4. Disconnect the battery ground cable.

Remove the battery cover.

5. Remove the Timing Cover.

6. Remove the VVT bush carrier.

Remove the two bolts and one nut which secure the carrier to the cylinder block.
Release the carrier from the two ring dowels and remove it.

7. Remove the seals from the bush carrier.

Remove the sealing ring (scarf jointed) from the carrier bush groove.
Remove the O-ring from the carrier oil-way recess.

8. Clean and inspect all relevant components.

Installation 

Variable Valve Timing Unit|Page 2472 > < Variable Valve Timing Unit|Page 2470