XK-8 Convertible (X100) V8-4.0L (AJ26) (1997)
6. Pull the VVT assembly clear and discard the O-ring.
Installation
1. Installing a new VVT solenoid assembly is the reverse of the removal procedure. Install a new O-ring, lubricated with petroleum jelly.
2. Install and tighten the two bolts to 10 - 14 Nm.
3. Remove the paintwork protection sheets and close the engine compartment cover.
4. Connect the battery and install the battery cover.