XK-8 Convertible (X100) V8-4.0L (AJ26) (1997)
1. Installation is the reverse of the removal procedure. Refer to the Battery Reconnection Procedure. See: Starting and Charging/Battery/Service and
Repair
NOTE: Install and lubricate new O-ring seals.