XK-8 Convertible (X100) V8-4.0L (AJ26) (1997)
30.
Install throttle body electrical connectors and vacuum pipe. (Illustration 11)
31.
Reposition and install throttle outer cable to adjustment bracket. (Illustration 12)
32.
Install but do not fully tighten outer cable adjustment nut.
33.
Turn throttle pulley fully open.
34.
Reconnect throttle inner cable to throttle pulley. (Illustration 13)