jaguar Workshop Repair Guides

Jaguar Workshop Service and Repair Manuals

Variable Valve Timing Bush Carrier - Bank 1|Page 1777 > < Variable Valve Timing Bush Carrier - Bank 1|Page 1775
Page 4
background image

Remove the wire.

2. Install the VVT unit to the engine.

Assemble the VVT unit, the exhaust camshaft sprocket and the secondary chain, in preparation for installing to the engine.
Install the above assembly to the camshafts with the chain correctly positioned over the tensioner; VVT unit to the intake and the sprocket to the
exhaust.
Install, but do not tighten, each bolt which secures the VVT unit and the exhaust sprocket to the camshafts.

3. Install the chain tensioning tool 303-532 to the exhaust camshaft sprocket.

Reposition the sprocket (and the VVT unit) for the most advantageous position for use of the tool.
Remove the tool.

4. Install the primary timing chain.

Install the primary chain to position over the crankshaft sprocket and the VVT unit sprocket. There  must be no slack on the drive side of the
primary chain.
The VVT unit must not be rotated on the camshaft

Variable Valve Timing Bush Carrier - Bank 1|Page 1777 > < Variable Valve Timing Bush Carrier - Bank 1|Page 1775