XKR Convertible (X100) V8-4.0L SC (AJ27) (2001)
9. Remove lock assembly from door handle.
Installation
1. Fit lock assembly to door handle.
2. Connect lock barrel link rod to operating arm.
3. Fit door handle to door.
-
Position and fully seat door handle.
-
Fit and tighten the two door handle securing screws.
-
Connect lock barrel operating arm link rod to motor.
-
Connect door handle to lock operating link rod.
4. Reposition PVC secondary water shedder.
5. Fit main water shedder to door.
-
Ensure that adhesive face of water shedder and all door contact surfaces are clean, free of grease and oil, and absolutely dry.
-
Commencing at the top, align and fit water shedder to door.
-
Reposition puddle lamp harness and secure to water shedder using suitable tape.
-
Position door casing center support bracket. and fit and tighten securing bolts.
6. Fit door casing.
7. Connect earth cable to battery terminal and fit battery cover.