XKR Coupe (X100) V8-4.0L SC (AJ27) (2000)
2. Install by-pass valve assembly to intake elbow.
Install new O-ring and lubricate with petroleum jelly.
Install bolts.
3. Install intake elbow to supercharger.
Install two bolts to intake elbow and install new gasket.
Position intake elbow assembly with by-pass hoses located on charge air cooler stub pipes.
Install and tighten four bolts.
Position hose securing clips.
4. Install left-hand support bracket to intake elbow and re-connect pipework.
Install bolt.
Fully tighten two bolts.
Connect breather/purge pipe T-piece to intake elbow.
Connect vacuum pipe to intake elbow.