XKR Coupe (X100) V8-4.0L SC (AJ27) (2000)
1. Install charge air cooler to adaptor.
Install new gasket.
Install charge air cooler.
2. Connect hoses to charge air cooler.
3. Install supercharger.
4. Install supercharger drive belt.
5. Install engine coolant outlet pipe.
6. Install supercharger outlet duct and new gasket.
7. Install throttle intake elbow.
8. Install exhaust gas recirculation valve (EGR) if applicable.
9. Install throttle body.
10. Install air cleaner cover intake assembly.
11. Refill cooling system.
12. Reconnect battery ground cable.