XKR Coupe (X100) V8-4.0L SC (AJ27) (2000)
1. Installation is reverse of removal procedure.
2. Tighten retaining plate bolt.
3. Fill with new fluid and bleed air from the system.
1. Installation is reverse of removal procedure.
2. Tighten retaining plate bolt.
3. Fill with new fluid and bleed air from the system.