XKR Coupe (X100) V8-4.0L SC (AJ27) (2000)
7. Measure bearing preload.
-
Position a flat washer to abut shim.
-
Install pivot pin nut.
-
Using a feeler gauge measure and record gap between shim and washer.
8. Remove shims from hub carrier.
-
Remove nut.
-
Remove washer.
-
Remove pivot pin.
-
Remove both shims from pivot sleeve.
9. Using 3.905 mm shim and preload measurements as a datum, select two new shims of equal thickness to provide a preload measurement of 0.076
mm.