XKR Coupe (X100) V8-4.0L SC (AJ27) (2000)
3. Tighten the nine bolts securing the valve body, to the specified torque figure.
4. Refit the dowel (leaf spring to valve body) and the leaf spring. Fit and tighten the securing bolt to the specified torque figure.
5. Tighten the center retaining bolt of the electrical connector to the specified torque figure.
6. Refer to fluid fill procedure. See: Fluid - A/T
7. Check for leaks and remove spilt fluid.