Cherokee 4WD L6-4.0L VIN S (1998)
7. Position the heater-A/C control in the instrument panel and secure it with four screws. Tighten the screws to 2.2 N.m (20 in lbs).
8. Reinstall the center bezel onto the instrument panel.
9. Connect the battery negative cable.