Cherokee 4WD V6-173 2.8L VIN W 2-bbl (1985)
Dash Panel: Service and Repair
Fig. 7 Instrument panel exploded view
1.
Disconnect battery ground cable.
2.
Remove lower instrument panel attaching screws, then the lower instrument panel.
3.
Remove instrument cluster as outlined previously.
4.
Remove radio and heater control panel attaching screws, then the control panel.
5.
Remove instrument panel switches.
6.
Remove defroster cowl panel to instrument panel attaching screws, then the defroster cowl panel.
7.
Remove instrument panel attaching bolts, then the instrument panel assembly.
8.
Reverse procedure to install. The instrument panel wiring harness is attached to the rear of the instrument panel and must be installed in
similar fashion to facilitate installation.