jeep Workshop Repair Guides

Jeep Comanche 4WD VIN H TBI Workshop Service and Repair Manuals

Oil Pump, Engine|Specifications|Page 640 > < Oil Pump, Engine|Specifications
Page 1
background image

Oil Pump: Service and Repair

4-150 & 6-243

REMOVAL

1. Remove oil pan as previously outlined.
2. Remove oil pump to cylinder block retaining bolts, then the oil pump and gasket. Do not disturb positioning of oil pump strainer and tube. If

tube is moved, a replacement tube and screen assembly must be installed to prevent pump cavitation.

Fig. 21 Checking oil pump gear end clearance. 4-150 & 6-243

Fig. 22 Checking oil pump gear to body clearance. 4-150 & 6-243

INSPECTION

1. Remove pump cover to body retaining screws, then the pump cover.
2. Measure gear end clearance by positioning Plastigage across the full width of each gear as shown. Reinstall pump cover and torque cover retaining

bolts to 70 inch lbs. Remove cover and determine clearance by comparing compressed Plastigage with scale on Plastigage envelope. Clearance
should be 0.002 - 0.006 inch. If clearance is excessive, replace oil pump.

3. Measure gear to pump body clearance by inserting a feeler gauge between each gear tooth and the pump body inner wall as shown. Clearance

should be 0.002 - 0.004 inch. If clearance is excessive, replace idler gear, shaft and drive gear assembly.

4. If checking pressure relief valve, remove pickup tube and screen assembly and position aside. Remove cotter pin, then slide spring retainer, spring

and pressure relief valve plunger out of pump body. If plunger binds during removal, clean or replace plunger as necessary. 

Oil Pump, Engine|Specifications|Page 640 > < Oil Pump, Engine|Specifications