Commander 2WD V8-4.7L Flex Fuel (2009)
4. Lower the engine into mounts using special tool (1) 8534B.
5. Install both the left and right side engine mount through bolts (3). Tighten the nuts to 68 Nm (50 ft. lbs.).
6. Remove special tool 8534B.
7. Install structural dust cover.
8. Install the front axle.
9. Fill engine oil.
10. Reconnect the negative battery cable.
11. Start engine and check for leaks.