jeep Workshop Repair Guides

Jeep Workshop Service and Repair Manuals

Procedures|Page 6767 > < Procedures
Page 2
background image

8. Size a replacement line, same size diameter and length as the portion of the line(s) removed.

NOTE: A minimum of 28.5 mm (3/4 in) of the line end must be cleaned in order for the connector fitting to properly seal the repair area.

9. Clean the ends of the line(s) a minimum of 28.5 mm (3/4 in) (dimension A) using the Scotch-Bright(R) pad provided with A/C Line Repair Tool

Kit 8456A. Clean the line end(s) with a rotational motion around the line to avoid longitudinal scratches in the line.

10. Select the proper connector fitting (1) for the size of the underbody line being repaired. See the Connector Fitting chart.
11. Apply one drop of Lokprep(R) sealing compound provided with A/C Line Repair Tool Kit 8456A onto each line end (2).
12. Insert the line ends into the selected connector fitting and rotate the connector fitting a complete turn to evenly distribute the sealing compound.

CONNECTOR FITTING

Procedures|Page 6767 > < Procedures