jeep Workshop Repair Guides

Jeep Workshop Service and Repair Manuals

Evaporative Emissions System > < Catalytic Converter|Description and Operation|Page 3030
Page 2
background image

7. Tighten the front exhaust pipe and catalytic converter assembly to muffler flange nuts to 47 Nm (35 ft. lbs.) torque.
8. Install steady rest bracket bolts. Tighten bolts to 47 Nm (35 ft. lbs.).
9. Connect oxygen sensor electrical connectors.

10. Install transmission crossmember.
11. Lower vehicle.
12. Start the vehicle and inspect for exhaust leaks. Repair exhaust leaks as necessary.

Evaporative Emissions System > < Catalytic Converter|Description and Operation|Page 3030