jeep Workshop Repair Guides

Jeep Workshop Service and Repair Manuals

Evaporative Emissions System > < Catalytic Converter|Removal|Page 3371
Page 2
background image

1.   Position catalytic converter into I-Pipe/muffler assembly.
2.   Using new gasket position catalytic converter against exhaust manifold.
3.   Install flange bolts. Tighten to 29 Nm (21 ft. lbs.).
4.   Working from the front of system; align each component to maintain position and proper clearance with underbody parts.
5.   Tighten band clamps to 55 Nm (40 ft. lbs.).

CAUTION: Band clamps should never be tightened such that the two sides of the clamps are bottomed out against the center hourglass
shaped center block. Once this occurs, the clamp has lost clamping force and must be replaced.

6.   Start the engine and inspect for exhaust leaks. Repair exhaust leaks as necessary.
7.   Check the exhaust system for contact with the body panels. Make the necessary adjustments, if needed.

Installation - Maniverter

INSTALLATION - MANIVERTER

NOTE: When assembling exhaust system do not tighten clamps until all components are aligned and clearances are checked.

1.   Position maniverter (1) in vehicle. Use a new flange gasket.
2.   Using new gasket, install maniverter (1) and mounting bolts. Tighten bolts to 28 Nm (250 in. lbs.).
3.   Install secondary thermostat.
4.   Install under floor catalytic converter.
5.   Working from the front of system; align each component to maintain position and proper clearance with underbody parts.
6.   Start the engine and inspect for exhaust leaks. Repair exhaust leaks as necessary.
7.   Check the exhaust system for contact with the body panels. Make the necessary adjustments, if needed.

Evaporative Emissions System > < Catalytic Converter|Removal|Page 3371