Grand Cherokee 2WD V6-3.7L (2008)
10. In engine compartment, attach vacuum hose to booster check valve (1).
11. Install the master cylinder to the power brake booster (1) with new gasket and nuts.
12. Reroute the wire harness (1) back into position and install the routing clip (3).