Grand Cherokee 2WD V8-4.7L VIN N (2000)
Fig. 1
4. Remove screws attaching front and rear of b-pillar lower trim to floor. (Fig. 1)
5. Remove access cover and remove screw attaching b-pillar lower trim to b-pillar.
6. Grasp b-pillar lower trim and pull outward to separate from b-pillar.
7. Route seat/shoulder belt through access hole in b-pillar lower trim.
8. Separate b-pillar lower trim from b-pillar.
INSTALLATION
1. Position b-pillar lower trim panel at b-pillar. (Fig. 1)
2. Route seat/shoulder belt through access hole in b-pillar lower trim.
3. Press b-pillar lower trim onto b-pillar.
4. Install upper screw attaching b-pillar lower trim to b-pillar.
5. Install access cover.
6. Install screw attaching front and rear of b-pillar lower trim to floor.
7. Re-clip quarter trim panel leg to floor.
8. Install front seat shoulder belt.
9. Install front door sill trim.
B-Pillar Upper Trim
B-PILLAR UPPER TRIM
REMOVAL