Grand Cherokee 2WD V8-4.7L VIN N (2000)
1. Install end of cable to speed control servo.
2. Slide speed control cable plastic mount into bracket.
3. Install speed control cable connector onto throttle body bellcrank pin (snaps on).
4. Slide accelerator cable plastic mount into bracket. Continue sliding until tab is aligned to hole in mounting bracket.
5. Route accelerator cable over top of cable cam.
6. Install accelerator cable connector onto throttle body bellcrank pin (snaps on).
7. Install air box housing to throttle body.
8. Connect negative battery cable at battery.
9. Before starting engine, operate accelerator pedal to check for any binding.