jeep Workshop Repair Guides

Jeep Workshop Service and Repair Manuals

Front Axle - 186FBI|Page 4364 > < Front Axle - 186FBI|Page 4362
Page 4
background image

Fig. 22

5. Install yoke with Screw 8112, Cup 8109, and Holder 6958 (Fig. 22).
6. If the original pinion bearings are being used, install differential assembly and axle shafts, if necessary,

NOTE:  If new pinion bearings were installed, do not install the differential assembly and axle shafts until after the pinion bearing preload and
rotating torque are set.

7. Install the yoke washer and a new nut on the pinion gear. Tighten the pinion nut until there is zero bearing end-play.
8. Tighten the nut to 271 Nm (200 ft. lbs.).

CAUTION:  Never loosen pinion gear nut to decrease pinion gear bearing rotating torque and never exceed specified preload torque. If preload
torque or rotating torque is exceeded a new collapsible spacer must be installed. The torque sequence will then have to be repeated.

Fig. 23

9. Using yoke holder 6958, a short length of 1 inch pipe, and a torque wrench set at 474 Nm (350 ft. lbs.), crush collapsible spacer until bearing end

play is taken up (Fig. 23).

NOTE:  If more than 474 Nm (350 ft. lbs.) of torque is necessary to remove the bearing end play, the collapsible spacer is defective and must be
replaced.

Front Axle - 186FBI|Page 4364 > < Front Axle - 186FBI|Page 4362