Grand Cherokee 2WD V8-4.7L VIN N (2000)
6.
Slide the new propeller shaft slip yoke onto the transmission or transfer case output shaft.
7.
Position the universal joint into the pinion yoke.
8.
Install the universal joint clamp and clamp bolts to the pinion yoke. Tighten the clamp bolts to 19 Nm (14 ft. lbs.).
9.
Lower the vehicle.
10.
Shift the transmission and transfer case to their Park positions.
POLICY: Reimbursable within the provisions of the warranty.
TIME ALLOWANCE:
Labor Operation No:
16-30-02-96
0.3 Hrs.
FAILURE CODE: P8 - New Part