jeep Workshop Repair Guides

Jeep Workshop Service and Repair Manuals

Cleaning and Inspection|Page 1997 > < Cleaning and Inspection|Page 1995
Page 2
background image

3. Place the 4 plastic locator dowels into the holes in the block.
4. Apply Mopers Silicone Rubber Adhesive Sealant, or equivalent, to the four corner joints. An excessive amount of sealant is not required to ensure

a leak proof seal. However, an excessive amount of sealant may reduce the effectiveness of the flange gasket. The sealant should be slightly higher
than the cross-over gaskets, approximately 5 mm (0.2 inch).

5. Install the front and rear cross-over gaskets onto the dowels.

6. Install the flange gaskets. Ensure that the vertical port alignment tab is resting on the deck face of the block. Also the horizontal alignment tabs

must be in position with the mating cylinder head gasket tabs. The words MANIFOLD SIDE should be visible on the center of each flange gasket.

7. Carefully lower intake manifold into position on the cylinder block and cylinder heads. Use the alignment dowels in the cross-over gaskets to

position the intake manifold. After intake manifold is in place, inspect to make sure seals are in place.

Cleaning and Inspection|Page 1997 > < Cleaning and Inspection|Page 1995