Grand Cherokee 2WD V8-5.7L VIN 2 (2005)
2. Install the three screws (1) that secure the instrument panel air outlets to the top cover. Tighten the screws to 2 N.m (17 in. lbs.).
3. Install the instrument panel ducts into the instrument panel.
4. Install the instrument panel