jeep Workshop Repair Guides

Jeep Workshop Service and Repair Manuals

Power and Ground Distribution|Fuse > < Power Distribution Center (PDC)|Page 4752
Page 3
background image

5. Install the battery positive cable (3) from the IPM B+ terminal stud.
6. Install the nut (2) from the IPM B+ terminal stud.
7. Close the IPM cover ensuring the locking tabs snap firmly in place.
8. Connect the battery negative cable.

Power and Ground Distribution|Fuse > < Power Distribution Center (PDC)|Page 4752