Grand Cherokee 2WD V8-5.7L VIN 2 (2005)
2. Install axle shaft (1) into axle tube and backing plate with new o-ring on axle.
3. Slip O-ring (2) through backing plate, then push axle through backing plate until bearing (1) is exposed.
4. Install O-ring (2) axle bearing.
5. Push axle into axle tube.
6. Install axle (2) flange nuts (1) and tighten to 119 Nm (88 ft. lbs.).