Grand Cherokee 4WD V8-4.7L (2003)
5.
While pulling down on the ITM snap ring, install two foam blocks to the top side of the ITM snap ring. The foam blocks should adhere to the ITM
snap ring and be positioned so that they are between the snap ring and the roof panel. (Fig. 1)
6.
Connect the electrical harness connector to the ITM.
7.
Install the ITM to the ITM snap ring.
8.
Connect the negative battery cable to the battery negative terminal.
9.
Set the clock to the correct time.
IF VEHICLE IS EQUIPPED WITH A SUNROOF:
1.
Turn the ignition switch to the OFF position.
2.
Disconnect the negative battery cable from the negative battery terminal.
3.
Remove the headliner from the vehicle. Refer to the appropriate Grand Cherokee Service Manual for headliner removal and installation
procedures.