Grand Cherokee 4WD V8-4.7L Flex Fuel (2009)
EXPORT
1. Install instrument panel cable (2) to instrument panel and secure into place.
2. Connect instrument panel cable (3) to radio.
3. Install the instrument panel See: Body and Frame/Interior Moulding / Trim/Dashboard / Instrument Panel/Service and Repair/Instrument Panel -
Installation.
4. Connect the battery negative cable.