Grand Cherokee 4WD V8-4.7L VIN N (2000)
12. Close both cable retention clips. Verify complete clip closure.
13. Adjust the outside handle rod.
14. While the liftgate is open and the latch control assembly is still uncovered, slowly open the outside latch handle to unlatch both side latches. Verify
both latches unlatch.
15. Cycle the liftgate closed and open to verify correct operation of the liftgate latch system.
16. Install the insulator pad.