Grand Cherokee 4WD V8-4.7L VIN N (2000)
Fig. 5
4. Install and tighten the screw that secures the upper mounting flange of the glove box latch striker to the instrument panel structural duct (Fig. 5).
5. If the inboard glove box latch striker was serviced, reinstall the lower right center bezel onto the instrument panel. If the outboard glove box latch
striker was serviced, reinstall the end cap onto the instrument panel.
6. Connect the battery negative cable.