jeep Workshop Repair Guides

Jeep Workshop Service and Repair Manuals

Lamps and Indicators - Engine > < Cleaning and Inspection|Page 2007
Page 3
background image

8. The following torque sequence duplicates the expected results of the automated assembly system.

-

Step 1-Tighten bolts 1 through 4, in sequence, to 8 Nm (72 inch lbs.) torque. Tighten in alternating steps 1.4 Nm (12 inch lbs.) torque at a
time.

-

Step 2-Tighten bolts 5 through 12, in sequence, to 8 Nm (72 inch lbs.) torque.

-

Step 3-Check that all bolts are tighten to 8 Nm (72 inch lbs.) torque.

-

Step 4-Tighten all bolts, in sequence, to 16 Nm (12 ft. lbs.) torque.

-

Step 5-Check that all bolts are tighten to 16 Nm (12 ft. lbs.) torque.

9. Install closed crankcase ventilation and evaporation control systems. 

10. Install the coil wires. 
11. Connect the heat indicator sending unit wire. 
12. Connect the heater hoses and bypass hose. 
13. Install distributor cap and wires. 
14. Hook up the return spring. 
15. Connect the accelerator linkage and, if so equipped, the speed control and transmission kickdown cables.
16. Install the fuel lines and fuel rail.
17. Install the support bracket to the intake manifold and the mounting bracket.
18. Install the generator and drive belt. Tighten generator mounting bolt to 41 Nm (30 ft. lbs.) torque. Tighten the adjusting strap bolt to 23 Nm (200

inch lbs.) torque. 

19. Install the A/C compressor on the mounting bracket.
20. Install the air cleaner.
21. Fill cooling system.
22. Connect the battery negative cable.

Lamps and Indicators - Engine > < Cleaning and Inspection|Page 2007