Grand Cherokee 4WD V8-5.7L (2008)
LEFT SIDE
NOTE: All torques should be done with vehicle on the ground with full vehicle weight.
1. Position the lower suspension arm (9) in the frame rail.
2. Install the frame rail bracket bolt (8) and nut (1) tighten to176 Nm (130 ft. lbs.).
3. Position the lower suspension arm(3) in the axle bracket.
4. Install the axle bracket bolt (1) and nut (2) Tighten to 210 Nm (155 ft. lbs.).
5. Install the fuel tank See: Powertrain Management/Fuel Delivery and Air Induction/Fuel Tank/Service and Repair/Fuel Tank - Installation.
6. Remove the supports and lower the vehicle.
Right Side
RIGHT SIDE
NOTE: All torques should be done with vehicle on the ground with full vehicle weight.