Grand Cherokee 4WD V8-5.7L VIN 2 (2007)
3. Tighten cylinder head cover bolts and double ended studs to 8 Nm (70 in. lbs). Begin torque sequence in the middle of head cover and torque
bolts moving outward in a crisscross pattern from top to bottom.
4. Before installing coil(s), apply dielectric grease to inside of spark plug boots (1).
5. Install ignition coils.
6. Torque fasteners (3) to 7 Nm (62 in. lbs).
7. Connect, ignition coil electrical connectors (1).
8. Install PCV hose.
9. Connect battery negative cable.