Grand Cherokee 4WD Laredo V8-4.7L (2002)
5. Install the battery wire harness over the two PDC B+ terminal studs. Torque the nuts to 11.3 Nm (100 in. lbs.).
6. Install the battery Refer to Battery System for the procedure.
7. Install the PDC cover.
5. Install the battery wire harness over the two PDC B+ terminal studs. Torque the nuts to 11.3 Nm (100 in. lbs.).
6. Install the battery Refer to Battery System for the procedure.
7. Install the PDC cover.