jeep Workshop Repair Guides

Jeep Workshop Service and Repair Manuals

Campaign - 4WD Transfer Case Snap Ring|Page 1600 > < Campaign - 4WD Transfer Case Snap Ring
Page 2
background image

Figure 1

Inspection

1.

Raise the vehicle on a hoist and locate the build code tag attached to the rear of the transfer case (Figure 1).

2.

Inspect the "Month-Day" and "Year-Shift" build code on the tag.

3.

If the "Month-Day" is 31 through 38 (March 1st through March 8th) and the shift in the "Year-Shift" is 2, the transfer case is suspect and requires
the repair service below.

Figure 2

Service Procedure (Continued)

Repair

If the transfer case build is within the parameters described in step 3 of the inspection procedure, the transfer case must be serviced as follows.

1.

Drain the transfer case by removing both the oil fill and drain plugs.

2.

Remove the transfer case skid plate, if so equipped.

3.

Place a jack stand under the transmission for support.

4.

Remove the crossmember that is located below the transfer case to gain working access to the transfer case front prop shaft universal joint.

5.

Mark the front prop shaft universal joint and transfer case yoke so that they can be reassembled later in the same position.

6.

Disconnect the universal joint from the front output shaft yoke.

Campaign - 4WD Transfer Case Snap Ring|Page 1600 > < Campaign - 4WD Transfer Case Snap Ring