jeep Workshop Repair Guides

Jeep Workshop Service and Repair Manuals

Engine - Long Crank Times To Start|Page 2895 > < Engine - Long Crank Times To Start|Page 2893
Page 4
background image

PANEL.

19.

Position the cargo area carpet and two cargo holdown clamps. Install the attaching steel rivets, p/n 06036484AA, to the cargo holdown clamps. Do
not use aluminum rivets. Use rivets specified to prevent holdown clamp pull-out.

20.

Install the swing gate scuff plate.

POLICY:
Reimbursable within the provisions of the warranty.

TIME ALLOWANCE:

FAILURE CODE:

Engine - Long Crank Times To Start|Page 2895 > < Engine - Long Crank Times To Start|Page 2893