jeep Workshop Repair Guides

Jeep Workshop Service and Repair Manuals

Procedures|Page 1987 > < Procedures|Page 1985
Page 7
background image

6. Position exhaust camshaft on bearing journals in the cylinder head.
7. Align exhaust cam timing mark (3) so it is parallel to the cylinder head as shown.

8. Install intake camshaft by raising the rear of the camshaft upward and roll the sprocket into the chain.

9. Align the timing marks (1) on the intake cam sprocket with the painted chain link.

10. Position the intake camshaft into the bearing journals in the cylinder head.
11. Verify that the timing marks (1) are aligned on both camshafts and that the timing marks (3) are parallel with the cylinder head.

CAUTION: Install the front intake and exhaust camshaft bearing cap last. Ensure that the dowels are seated and follow torque sequence

Procedures|Page 1987 > < Procedures|Page 1985