jeep Workshop Repair Guides

Jeep Workshop Service and Repair Manuals

Valve Spring > < Cylinder Head Cover - Removal|Page 2080
Page 2
background image

NOTE: When using RTV, parts should be assembled in 10 minutes and tighten to final torque within 45 minutes.

4. Apply a dot of Mopar(R) engine sealant RTV or equivalent to cylinder head/front cover T-joints (1).

5. Install cylinder head cover assembly to cylinder head and install all bolts, ensuring the studs are located as shown.
6. Tighten bolts in sequence shown using a 2 step torque method as follows:

a. Tighten all bolts to 5 Nm (44 in. lbs.)
b. Tighten all bolts to 10 Nm (90 in. lbs.).

7. Install ignition coils. Tighten fasteners to 8 Nm (70 in. lbs.).
8. If the PCV valve was removed, tighten PCV valve to 5 Nm (44 in. lbs.).
9. Connect PCV and make-up air hoses to cylinder head cover.

10. Install engine cover.

Valve Spring > < Cylinder Head Cover - Removal|Page 2080