Patriot 2WD L4-2.4L (2009)
10. Install the stabilizer link nuts (2).
11. Tighten the nuts to 58 Nm (43 ft. lbs.).
12. Support the rear cradle assembly (1) with a suitable lifting device and position back into the vehicle.
13. Install the cradle bolts (2 and 3):
a. Tighten the front bolt (2) first to 110 Nm (81 ft. lbs.).
b. Tighten the rear bolt (3) next to 110 Nm (81 ft. lbs.).
14. Install the trailing link (1) bushing bolts (2 and 3):
a. Tighten the inboard bolt (3) first to 110 Nm (81 ft. lbs.).
b. Tighten the outboard bolt (2) next to 110 Nm (81 ft. lbs.).