jeep Workshop Repair Guides

Jeep Workshop Service and Repair Manuals

Cylinder Head Cover(s) - Removal|Page 1693 > < Cylinder Head Cover(s) - Removal|Page 1691
Page 2
background image

NOTE: When using RTV, parts should be assembled in 10 minutes and tighten to final torque within 45 minutes.

4. Apply a dot of Mopar(R) engine sealant RTV or equivalent to cylinder head/front cover T-joint (1).

5. Install cylinder head cover assembly to cylinder head and install all bolts, ensuring the studs are located as shown. 
6. Tighten bolts in sequence shown using a 2 step torque method as follows:

a. Tighten all bolts to 5 Nm (44 in. lbs.).
b. Tighten all bolts to 10 Nm (90 in. lbs.).

7. Install ignition coils. Tighten fasteners to 8 Nm (70 in. lbs.).
8. If the PCV valve was removed, tighten PCV valve to 5 Nm (44 in. lbs.).
9. Connect coil electrical connectors (1).

10. Connect PCV hose (5) to PCV valve.
11. Connect make up air hose (2).

Cylinder Head Cover(s) - Removal|Page 1693 > < Cylinder Head Cover(s) - Removal|Page 1691