jeep Workshop Repair Guides

Jeep Workshop Service and Repair Manuals

Oil Intake Control Valve - Installation|Page 1593 > < Oil Intake Control Valve - Installation
Page 2
background image

5. Connect electrical connector to oil pressure sensor.
6. Connect electrical connector to Variable valve timing solenoid.
7. Connect negative battery cable.
8. Install engine cover.

Rear

REAR SOLENOID 1/2

1. Rear variable valve timing solenoid. Note mounting tab location is different between front and rear solenoids.
2. Install solenoid into cylinder head.
3. Install mounting bolt and tighten to 12 Nm (9 ft. lbs.).
4. Connect electrical connector to Variable valve timing solenoid.

5. Connect negative battery cable.
6. Install engine cover.

Oil Intake Control Valve - Installation|Page 1593 > < Oil Intake Control Valve - Installation