jeep Workshop Repair Guides

Jeep Workshop Service and Repair Manuals

Steering Gear Replacement|Page 4835 > < Steering Gear Replacement|Page 4833
Page 13
background image

3. Measure the end-play of preload adjuster with a feeler gauge. End-play must not exceed 0.05 mm (0.002 inch). If end-play exceeds specifications

install replacement shim to obtain correct end-play.

4. Tape threads and spline of the pitman shaft to protect the seal during shaft installation.

5. Lubricate the pitman shaft. and install the shaft into the gear housing. The pitman shaft center tooth must be engaged with the center groove of the

ball nut.

6. Install the cover gasket and cover on the housing. Thread preload adjuster counter-clockwise into the cover until the cover makes contact with the

housing.

7. Install cover bolts finger tight, then back off adjuster 1/2 turn.
8. Tighten cover bolts to 61 Nm (45 ft. lbs.).
9. Adjust over-center preload.

10. Install steering gear.

Worm Shaft and Ball Nut

DISASSEMBLY 

1. Remove the pitman shaft.

Steering Gear Replacement|Page 4835 > < Steering Gear Replacement|Page 4833