Rio L4-1.5L (2001)
Shift Solenoid: Testing and Inspection
Linear Solenoid Valve
LINEAR SOLENOID VALVE
Resistance inspection
1. Disconnect negative battery cable.
2. Disconnect solenoid valve connector.
3. Measure resistance between ground terminals and of connector terminal H-02-7.
Resistance: 4.1 - 5.1 ohms
4. If not connect, check wiring for an open or short-circuit, replace pressure control valve.
5. Connect solenoid valve connector.
6. Connect negative battery cable.