Rondo L4-2.4L (2007)
7. Install the coolant hoses(A) to the throttle body.
8. Install the delivery pipe(A).
9. Install the engine wire harness connectors.
1) Install the ETC connector(B), CMP connector(C) and the knock sensor connector(D).
7. Install the coolant hoses(A) to the throttle body.
8. Install the delivery pipe(A).
9. Install the engine wire harness connectors.
1) Install the ETC connector(B), CMP connector(C) and the knock sensor connector(D).